This project involves the construction of a new two lane concrete bridge and associated civil works to replace existing single lane timber and concrete bridge on Froomes Road.
Froomes Road Bridge was assessed as needing replacement following a condition assessment undertaken in February 2018. The assessment found that the bridge was at its end of life, with several serious structural issues identified. Vehicle load restrictions apply.
A design for a replacement bridge was previously completed with:
• The new structure accommodating two lanes of traffic to match the road width.
• The deck level being raised to reduce the risk of complete inundation.
• The barriers complying to current standards and incorporating heritage consideration if possible.