Stormwater that falls on a property is collected and drained to what is usually the lowest point on the property, which is known as the legal point of discharge.
This collected stormwater is then discharged or released to the Council stormwater system, which is usually an underground drain in the street or in a property easement.
If no underground drain is available, the stormwater is drained to the kerb and channel in the nearby street.
In some cases, the property owner will be required to construct a new drain to connect with Council’s stormwater system. This is known as the point of connection.
As part of your Building Permit application you will need to obtain a legal point of discharge report for your property.
You may also need to obtain a legal point of discharge report, if you are preparing Engineering Plans for Council approval.
We prefer you submit your application online. If you're unable to apply online, you can apply via email, mail or in person.
If you’re building an entirely new structure or undertaking repair works on the roof or to private drains, it’s important not to block stormwater from draining away.
You must ensure that your private drain is connected legally to the Council drainage system or kerb and channel to avoid the stormwater from causing damage.
Equally you do not want anything other than the rain to enter the stormwater system and potentially contaminate our lakes, waterways and the ocean.
The legal point of discharge report will provide information on:
The report does not contain information regarding the existing private stormwater system on the property or the existing point of connection.
Council has limited information on the location of drainage on residential and commercial properties, as plumbers are not required to inform Council of the location of these private drains when they install them.
Your application must include:
What happens next?
You should receive a report within 10 business days.
We will provide a report (with diagrams) detailing the location of your discharge point. Any additional information you have requested (such as pipe depths) will be included in the report, however this information is not always available.
Download and complete the Application for Property Information(PDF, 194KB) form.
Email your completed form and supporting documents to info@mountalexander.vic.gov.au.
We will contact you to pay the fee.
Send your completed form and supporting documents to:
Mount Alexander Shire CouncilPO Box 185Castlemaine VIC 3450
Visit us at the Castlemaine Civic Centre to submit your application:
Corner of Lloyd and Lyttleton Streets, Castlemaine, Victoria. 3450
We will contact you to pay the fee, or you can pay when you submit.